This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
simulation_page [2023/02/13 10:56] mina [Menu] |
simulation_page [2023/02/20 11:15] mina [Basic settings] |
||
---|---|---|---|
Line 1: | Line 1: | ||
====== Simulation Page ====== | ====== Simulation Page ====== | ||
- | The simulation page lets you run best estimat | + | The simulation page lets you run best estimate |
===== Menu ===== | ===== Menu ===== | ||
Line 19: | Line 19: | ||
* **Best estimate** - Run a deterministic simulation, using nominal parameter values. | * **Best estimate** - Run a deterministic simulation, using nominal parameter values. | ||
* **Probabilistic** - Run a Monte Carlo simulation, using probability density functions for uncertain parameters. | * **Probabilistic** - Run a Monte Carlo simulation, using probability density functions for uncertain parameters. | ||
- | | + | |
* **Number of simulations** - Only applies when running a probabilistic simulation. Set the number of realizations (iterations) to perform. | * **Number of simulations** - Only applies when running a probabilistic simulation. Set the number of realizations (iterations) to perform. | ||
Line 54: | Line 54: | ||
* Produce specified output only - The time vector will contain only the time points given **Time Series**. This setting will greatly decrease memory consumtion and will improve simulation speed. | * Produce specified output only - The time vector will contain only the time points given **Time Series**. This setting will greatly decrease memory consumtion and will improve simulation speed. | ||
- | |Note|For probabilistic, sensitivity analysis | + | |Note|For probabilistic |
* **Time series** – This field is only available when the output option is set to either ‘Produce additional output’ or ‘Produce specified output’. To create a time series click the **Add** button. From the window that appears select the type of time series you want to create using the drop-down list. You can add as many time series as you want. However, the possibility to add more than one time series is typically only used when you wish to combine a linear/ | * **Time series** – This field is only available when the output option is set to either ‘Produce additional output’ or ‘Produce specified output’. To create a time series click the **Add** button. From the window that appears select the type of time series you want to create using the drop-down list. You can add as many time series as you want. However, the possibility to add more than one time series is typically only used when you wish to combine a linear/ |