User Tools

Site Tools


tutorial_5-connecting_the_sub-systems

Tutorial 5 - Connecting the Sub-systems

4/5

Connecting the sub-systems

  1. Close, or “collapse”, all the sub-systems.

  2. Add a Connector block in the off-diagonal cell connecting Agricultural Land with Concentrations in Food.


  3. Edit the Connector and connect the Conc_Soil block in the sub-system AgriLand to Conc_Soil - Conc_Food.


  4. Add a Connector block in the off-diagonal cell which connects Agricultural land with Doses.

  5. Edit the Connector and click the Values tab. Connect Conc_Soil-AgriLand and Conc_Soil-Doses.

  6. Add a Connector block in the off-diagonal cell which connects Concentrations in Food with Doses.

  7. Edit the Connector and connect Conc_Crops-Conc_Food with Conc_Crops-Doses.


Running a simulation

Follow the steps below to run a simulation and see if the connections have been made:

  1. Add both Conc_Soil-AgriLand and Conc_Soil-Doses to the list of outputs in Simulation Settings.


  2. Run a new simulation and plot these two outputs in the same graph. If Conc_Soil (AgriLand) and Conc_Soil (Doses) are connected the outputs should be identical.


Next

Previous

References

tutorial_5-connecting_the_sub-systems.txt · Last modified: 2023/03/28 16:20 by dmytroh