Tutorial 4 - Running the simulation

5/5

Simulation settings

  1. Click the Simulation button on the toolbar.
  2. Click the Run button on the toolbar to start the simulation.
  3. After the simulation has finished, open the Results window (if it is not already open). Select the output for “Plant”.
  4. Open the Charts window. If you entered everything correctly, the Quick view should look like the graph below:


Solution to the exercise

Previous

Reference